The Freeman's Texas Estate

Ellington Model

Home Page


June 28, 2008 - The brick is finished. It looks a little bit dingy at this point because of the excess mortar from installation. Once all the bracing comes down the brick will be acid washed removing the excess mortar, making the brick look clean and perfect.



The siding, eaves and trim have been painted.






Close-up of the front entry.



Home Sweet Home!.



The walls have been taped and textured. I haven't figured out why they didn't texture the ceilings at the same time. Since I don't speak the language, I couldn't ask anyone.






Looking down the stairs to the landing.






The garage does not get textured, paint only.



Home Page

© Copyright 2008. All Rights Reserved